60-Unit Multi-Family Apartment Complex | Stanwood, WA
Completed for Exxel Pacific | 100,000+ Sq. Ft. of James Hardie® Siding | 600+ Windows & Doors | Pine Tongue & Groove Soffits
Alpine Exteriors was proud to partner with Exxel Pacific, one of the largest and most respected multi-family builders in Washington State, to complete the full exterior cladding and opening installation for this 60-unit apartment complex in Stanwood, WA. This new construction project involved high-volume siding, custom soffits, and large-scale window and door packages — all executed in phases and integrated with the general contractor’s aggressive production schedule.
Siding Installation – Over 100,000 Square Feet
We installed a diverse range of James Hardie® fiber cement siding profiles, including:
Traditional 8 ¼” lap siding
Vertical board and batten panels
This combination created dynamic architectural interest while delivering long-lasting, low-maintenance performance in Washington’s challenging coastal climate. All siding was installed over commercial WRB systems with code-compliant flashing, drainage plane detailing, and manufacturer-specified fasteners.
Window & Door Installation – Over 600 Units
Our team installed 600+ window and door units, including:
Large-scale vinyl windows
Sliding glass doors for balconies and patios
Swing doors for unit entries and shared access points
All openings were flashed, sealed, and installed with air and water barrier continuity in mind — meeting the latest energy code and Exxel’s strict quality control standards.
Custom Soffit Installation – Pine Tongue & Groove
As a key architectural feature, Alpine Exteriors also furnished and installed pine tongue & groove enclosed soffits across all building elevations, stairwells, and breezeways — providing a natural wood accent that adds warmth and curb appeal to this large-scale multi-family property.
This 60-unit project is a strong example of Alpine Exteriors’ ability to deliver commercial-grade cladding and window packages at scale, on time, and in sync with top general contractors like Exxel Pacific.
stanwood_multi_family_siding_project_exxel_pacific_james_hardie_lap_siding_board_and_batten_apartment_building_cladding_large_scale_window_installation_multifamily_construction_commercial_siding_contractor_washington_state_milgard_window_installer_pine_tongue_and_groove_soffits_600_windows_doors_alpine_exteriors_multifamily_contractor_project_1730_building_envelope_solution_condo_apartment_complex_cladding_wrapping_siding_package_commercial_exterior_subcontractor_code_compliant_cladding
✔️ Trusted by the largest builders in Washington for high-volume siding, envelope, and opening scopes — Alpine Exteriors delivers dependable results for the most demanding schedules.
⚠️ Multi-family construction requires experienced subcontractors who can scale manpower, meet tight production milestones, and deliver consistent quality across hundreds of units. With Alpine, your envelope is done right — the first time.
Call Us Today
Alpine Exteriors has been Whatcom and Skagit County’s premier exterior remodeling company.Find Best Residential Siding Company & Contractors near me in bellingham
Lic#:ALPINS*823PA
Gallery
© Copyright 2003-2025 Alpine Siding Contractors